Sedna is a South African company that turns plastic waste recyclers cannot use into fuel, through its PlastIQ process. Its first plant, at Atlantis in the Western Cape, was still a greenfield site when we started. ATS planned the data and technology the plants would need, from sensors on the plant floor to investor reporting, then built the dashboard Sedna used to show investors its progress before the first plant runs.
IoT, cloud and RFID options, scored on 5 weighted criteria.
From plastic intake to product dispatch.
From signed scope to a dashboard live on Sedna's own domain.
Then owned and run by Sedna's own team.
The challenge
Sedna was building from zero, with demanding requirements on every side.
- No systems yet. The first plant had not been built, so every technology choice had to be made deliberately to avoid costly retrofits later.
- Certification by design. ISCC PLUS certification needs every kilogram tracked through chain of custody and mass balance. That has to be designed into the data from the start, not added later.
- Hard operating conditions. Systems had to keep working through power cuts and patchy connectivity at the plant.
- Investors needed to see progress now. With months to go before the first plant runs, there was no operational data to show, but investors still wanted a clear, current view of permits, partnerships, feedstock and spend.


Illustrative photos (Unsplash). Click to enlarge.
What we built
The technical roadmap
- Discovery first. Three structured workshops with Sedna's leadership and engineering team, covering operations, IoT and sensors, KPIs and finance.
- Every data point defined. A KPI framework and a full data inventory for each stage of the plant, from feedstock intake through pyrolysis, oil processing, char handling, dispatch and utilities.
- Edge-first architecture. Plant data is collected and stored locally so operations keep running during outages, then synced to the cloud when the connection returns.
- Independent vendor evaluation. 10 IoT, cloud and RFID platforms screened against pass/fail rules (certification audit trails, offline operation, client data ownership, no lock-in) and scored on 5 weighted criteria, including five-year cost of ownership.
- Certification designed in. Chain of custody, mass balance, greenhouse-gas data and documentation all mapped to the system design, with a mass-balance closure target above 99.5%.
- A staged plan. Four phases, starting with a quick win for investors and building to one design that can be reused at each new plant.
The pre-operations investor dashboard
- Built on the roadmap's own recommendation: a way to show investors progress before the plant produces any data.
- Regulatory and milestone tracking per site, with progress, upcoming milestones and site-by-site comparison.
- Feedstock supplier pipeline: commitment stages, estimated daily capacity and regional spread.
- Live financials: actuals pulled automatically from the accounting system for both group entities.
- One dashboard, three views: investors see a summary, the internal team sees full detail, and administrators can switch between the two when presenting.
- Updated by Sedna's team, not developers: the data sits in a simple workspace the team edits directly, with training and handover documentation.
How we worked
- Understand the operation. Workshops with leadership and engineering before recommending any technology.
- Plan the whole system. One roadmap covering data, sensors, cloud, reporting and certification, written so Sedna could build it with any qualified partner.
- Deliver the first step. The investor dashboard, built in about 12 weeks within the agreed budget, then handed over with full ownership to Sedna's own team.
Working on something similar?
We help infrastructure and industrial companies plan their data and technology before they build, then deliver the first systems that prove the plan.